Old Bridge

Wey BridgeThe road surface over Weybridge’s Old Bridge has been poor for too long.   Wey Meadows residents pointed out to me that this short stretch must be the worst in Weybridge.  I called Surrey’s chief highways engineer who reviewed the situation and told me that following inspection of the bridge the structure team had decided to bring the resurfacing work forward to June or July this year.

In the meantime there will be extra patching (now installed but not satisfactory).

Surrey structures team does not believe that the poor surface threatens the integrity of the bridge itself.

I would bring all the schedules of work into the public domain so that we could at least see the order in which these works were to be done and why.  Whilst none of us want delay (like waiting for a bus) we feel better if we know when the project will begin (like bus indicator boards).  The technology is not that expensive and I believe it would save Surrey money.

Leave a Reply

Your email address will not be published. Required fields are marked *